Saltar al contenido principal

Free Tool

How many cubic yards is that?

Length, width and depth in — cubic yards and cubic feet out. The one conversion every bulk material order runs through.

ft

El lado más largo del hueco que vas a rellenar.

ft

El lado contiguo.

in

Hasta dónde llega el relleno.

USD

Opcional — escriba lo que paga y el costo del material aparecerá abajo.

Vas a necesitar unos

1.23

cu yd

33.3

cubic feet exact

100

sq ft

¿Vas a pedir relleno, piedra o mortero? Convierte el volumen en un cotización con precios. Crear una cotización gratis.

Recibe la próxima herramienta antes que nadie

Nuevas calculadoras gratuitas y un consejo corto por semana para llevar un negocio de oficios: sin spam, te das de baja cuando quieras.

Cómo se calcula

length × width × depth = volume in cubic feet · cubic feet ÷ 27 = cubic yards. The only trap is depth: it is almost always quoted in inches while the other two are in feet, so it has to be divided by 12 before anything is multiplied.

Es una estimación de planeación: conviene confirmarla siempre con tu proveedor y con las particularidades de la obra antes de pedir material.

Cubic yard calculator: FAQ

How do you calculate cubic yards?

Multiply length × width × depth with every dimension in feet, then divide by 27, because a cubic yard is 3 × 3 × 3 feet. If your depth is in inches — and it usually is — divide it by 12 first. A 10 × 10 ft area at 4 inches deep is 10 × 10 × 0.333 = 33.3 cubic feet, or 1.23 cubic yards.

How many cubic feet are in a cubic yard?

27. It catches people out because a yard is only 3 feet, but volume goes up with the cube: 3 × 3 × 3 = 27.

Why does my supplier quote in yards but the bag says cubic feet?

Bulk material is sold by the cubic yard from a yard or truck; bagged material is sold by the cubic foot. A 2 cubic foot bag of mulch is 1/13.5 of a yard, so a yard is about 13.5 bags — which is why bulk is almost always cheaper once you are past a few bags.

Should I order extra?

Usually yes. Bulk material settles, subgrade is never perfectly flat, and running short means a second delivery fee that dwarfs the cost of the extra material. Ten percent is a common allowance on fill and aggregate.

Más herramientas gratis

Todas las herramientas