How much rebar do I need?

Slab size and bar spacing in — bars to order, total linear footage, and the number of intersections your crew has to tie.

m

Longest side of the pour.

m

The adjacent side.

cm

On centre, both ways. Take it from the drawings — 12, 16 and 18 in are common.

m

Length of one bar as delivered. 20 ft is the usual US stick.

Optioneel — vul uw inkoopprijs in, de materiaalkosten verschijnen hieronder.

Je hebt ongeveer nodig

32

bars to order

192

linear ft of bar

32

bars in the mat

256

intersections to tie

Bidding a slab? Turn the rebar and concrete takeoff into a priced estimate. Build a free estimate.

Get the next tool first

New free calculators and one short weekly tip for running a trades business — no spam, unsubscribe anytime.

How this is calculated

bars one way = slab width ÷ spacing + 1 · bars the other way = slab length ÷ spacing + 1 · total linear = each count × the length it spans · ÷ stock length = bars to order. The "+1" is the bar at the far edge, and forgetting it is the most common way a rebar order comes up one bar short in each direction.

This is a planning estimate — always confirm against your supplier and the specifics of the job before ordering.

Rebar calculator: FAQ

How much rebar do I need for a slab?

Count the bars each way and add one, because a grid at 16 in on centre across a 20 ft slab is 15 spaces but 16 bars. A 20 × 20 ft slab at 16 in gives 16 bars each way, roughly 640 linear feet, which is 32 twenty-foot sticks before laps.

Does this include lap splices?

No. Where bars are spliced, the overlap is specified as a multiple of the bar diameter — commonly around 40 diameters, but the actual figure comes from the drawings or the engineer, and it changes with bar size, concrete strength and whether the splice is in tension. Add the laps to the linear footage before you order.

What spacing and bar size should I use?

Take both from the drawings. Slab reinforcement is engineered around the loads, the subgrade, the concrete mix and what the slab is for; a driveway, a footing and a structural slab are not the same problem. This tool counts the mat that a specified spacing produces — it does not decide the spacing.

How many ties do I need?

One at each intersection if you are tying every crossing, which is what the intersection count here gives you. Many crews tie every other intersection in a staggered pattern on flat slab work, which halves the ties and the labour; on anything structural, follow the spec.