How much gravel do I need?

Works for decorative gravel, hardcore and MOT Type 1 sub-base alike — area and depth in, cubic metres and tonnes out.

Area to cover.

cm

Around 5–10 cm (2–4 in) is typical for gravel.

£

Optional — enter what you pay and the material cost appears below.

You'll need about

1.60

m³ of gravel

2.6

t (approx)

20

Quoting hardscape or aggregate? Turn the takeoff into a priced estimate. Build a free estimate.

Get the next tool first

New free calculators and one short weekly tip for running a trades business — no spam, unsubscribe anytime.

How this is calculated

area × depth = volume · volume × 1,600 kg/m³ ≈ weight. Compacted MOT Type 1 sits at the heavier end of that range, loose decorative shingle at the lighter end.

This is a planning estimate — always confirm against your supplier and the specifics of the job before ordering.

Gravel & hardcore calculator: FAQ

How much gravel do I need?

Multiply area by depth. A 30 m² path at 50 mm needs 1.5 m³, which is about 2.4 tonnes. Suppliers quote loose aggregate by the tonne and bulk bag, so both figures are worth having before you ring round.

How deep should MOT Type 1 be?

For a domestic drive, 100–150 mm compacted is the usual specification, laid in layers and whacked between each one rather than in a single lift. Soft or clay ground takes more. Depth here matters far more than the surface above it.

How much does a bulk bag cover?

A bulk bag is normally around 800 kg, so roughly half a cubic metre of aggregate. At 50 mm depth that covers about 10 m². Bag weights vary between suppliers, so check rather than assume when the order is close to a whole-bag boundary.

Is hardcore the same as MOT Type 1?

Not quite. Hardcore is a general term for crushed fill, which can be recycled material of variable quality. MOT Type 1 is a graded specification with a defined particle range that compacts to a stable surface, which is why it is what gets specified under drives and slabs.