1.Castaways Energy
1629 Prime Ct #600, Orlando, FL 32809, USA
Editorial by Andre Caçador, Founder of Hero365 · Sources: Google Places · Last updated Oct 31, 2026
1629 Prime Ct #600, Orlando, FL 32809, USA
6900 Tavistock Lakes Blvd Ste 400, Orlando, FL 32827, USA
8810 Commodity Cir Suite 17A, Orlando, FL 32819, USA
100 E Pine St #110, Orlando, FL 32801, USA
8240 Exchange Drive Suite: Cloud 1, Orlando, FL 32809, USA
6211 Edgewater Dr, Orlando, FL 32810, USA
7800 Southland Blvd Ste 100, Orlando, FL 32809, USA
735 Irma Ave, Orlando, FL 32803, USA
157 Drennen Rd, Orlando, FL 32806, USA
4710 Parkway Commerce Blvd, Orlando, FL 32808, USA
8600 Commodity Cir Unit 154, Orlando, FL 32819, USA
4401 E Colonial Dr #203b, Orlando, FL 32803, USA
3601 Vineland Rd #4, Orlando, FL 32811, USA
1519 W Smith St, Orlando, FL 32804, USA
1106 W Central Blvd, Orlando, FL 32805, USA
1650 Sand Lake Rd #100, Orlando, FL 32809, USA
6901 Tpc Dr #650, Orlando, FL 32822, USA
2151 Consulate Dr Ste 17, Orlando, FL 32837, USA
2505 Annandale Ave, Orlando, FL 32810, USA
Most Orlando-area residential quotes land between roughly $2.40 and $3.60 per installed watt before incentives. A typical home here uses a 6 to 10 kW system, which puts total cost around $15,000 to $35,000. Lower numbers usually mean a simple asphalt shingle roof, standard panels, and no battery. Higher numbers usually mean premium panels, a complex roofline, or tile that has to be lifted and re-flashed. Tile roofs are common in Orlando subdivisions, and they often add several thousand dollars to the labor. Batteries are a separate line item. Expect about $10,000 to $18,000 installed for a single 10 to 13.5 kWh unit, depending on brand and whether you need a critical-loads panel. Many Orlando buyers have been asking about batteries since the 2022 and 2024 hurricane seasons, when multi-day outages hit Central Florida. Pricing varies, so get two or three itemized quotes. On the incentive side, Florida has no state income tax credit, but it does offer two useful exemptions. Solar equipment is exempt from state sales tax (Fla. Stat. 212.08), and the added home value from a solar system is exempt from property tax assessment (Fla. Stat. 193.624). The federal residential credit under Section 25D was repealed for expenditures made after December 31, 2025, under the 2025 federal budget law. If you are buying with cash or a loan in late 2026, do not count on a 30 percent credit, and ask a tax professional about any third-party-owned options. Without the credit, payback in Florida commonly runs about 9 to 14 years depending on your rate, usage, and system price. Any installer promising a flat number should show you the math.
Start with the license, then look at what happens after the sale. Florida installers should hold a Certified Solar Contractor license (the CVC prefix) or a Certified Electrical Contractor license, and you can check either in about two minutes at MyFloridaLicense.com. Confirm that the license is active, that the name on it matches the name on your contract, and that there are no recent disciplinary actions. Be wary of a salesperson who says the company is licensed but cannot tell you who the qualifying license holder is. The 2025 bankruptcies of large national solar lenders and installers, including Sunnova and Mosaic, showed homeowners what happens when a warranty is only as good as the company behind it. Ask who stands behind the workmanship warranty (look for 10 years or more on roof penetrations), whether panel and inverter warranties are manufacturer-backed, and what happens to your loan or lease if the installer closes. A local company with a long track record in Orange, Seminole, and Osceola counties is not automatically better, but it is easier to hold accountable. Compare quotes on the same basis: system size in kW, panel and inverter models, roof attachment method, estimated annual production in kWh, and the total price per watt. Ask who does the roof work, since a solar crew that subcontracts penetrations can leave you with a leak and two companies blaming each other. Under Fla. Stat. 489.126, deposits are generally capped at 10 percent of the contract price before work begins, with exceptions for specially ordered materials. Treat a request for a large upfront payment as a red flag. Also remember the federal three-day cancellation right on sales made at your home.
Contractor licensing in Florida is handled at the state level by the Department of Business and Professional Regulation (DBPR) and its Construction Industry Licensing Board. Orlando does not issue its own solar contractor license, though local jurisdictions may require a business tax receipt. If something goes wrong with a licensed contractor, DBPR takes complaints, and the Florida Homeowners' Construction Recovery Fund may offer limited compensation in qualifying cases involving financial loss. Permitting depends on where your address sits. Homes inside the City of Orlando go through the city's permitting office. Homes in unincorporated Orange County go through the Orange County Building Safety Division. Winter Park, Apopka, Ocoee, Winter Garden, Kissimmee, and other nearby cities each have their own building departments. Ask your installer which one has jurisdiction and whether they pull the permit themselves. They should. Expect a building and electrical permit, plus a final inspection before the utility will allow you to turn the system on. The next gate is utility interconnection. Your installer submits an application to your electric provider, and you should not energize the system until you receive permission to operate. Systems must follow the Florida Building Code, including wind-load requirements, and the National Electrical Code, including rapid shutdown rules. Florida law (Fla. Stat. 163.04) also prevents HOAs from outright prohibiting solar collectors on a home, although they can set reasonable placement rules. If your HOA pushes back, ask your installer to cite that statute in writing.
Wind is the first thing a Central Florida solar design has to address. Orlando sits inland, but hurricanes still reach it. Milton in October 2024 and Ian in 2022 both brought damaging wind and tornado activity to the region. Ask your installer how the racking is rated, what the attachment spacing is, and whether the engineering is stamped for the Florida Building Code wind loads at your address. A good installer shows you the engineering letter without being asked. Roof condition matters more than most buyers expect. Panels last 25 years or more, so a roof with 5 or 8 years left should be replaced first, or at least inspected. Florida insurers have also tightened roof-age requirements, and a solar install can trigger an underwriting review. Call your insurance agent before you sign, and ask whether the carrier has rules on panels or roof age. Orlando's mature tree canopy, especially live oaks, is a major production factor. A few hours of shade in the afternoon can cut yield noticeably. Ask for a shade analysis using a tool like a Solmetric or Aurora report, not a guess. Tree trimming or removal may require a permit under the City of Orlando or Orange County tree rules, so check before you promise to cut anything. Finally, summer afternoon thunderstorms mean lightning and surge risk. Ask about surge protection and grounding. Pollen in spring and Florida humidity can leave a film on panels, so an occasional rinse helps. The Florida Solar Energy Center at UCF publishes useful homeowner guidance on system performance in Florida conditions.
Not every Orlando-area home buys power from the same utility, and that changes your solar economics. Most homes inside the City of Orlando are served by the Orlando Utilities Commission (OUC), a municipal utility. Many surrounding addresses in Orange, Seminole, and Osceola counties are served by Duke Energy Florida or by other co-ops and municipal utilities. Check your bill before you request quotes, and tell each installer which utility you have. Net metering in Florida is governed for investor-owned utilities by the Public Service Commission rules. In practice, excess solar production is typically credited to your account and carried forward, which reduces later bills. Policy details differ between utilities, and credits for unused balances at year end may be paid at a lower rate than retail. OUC sets its own program terms. Request the current interconnection and net metering terms in writing from your utility, rather than relying on an installer's summary. Florida's legislature has debated net metering changes in recent years. A bill that would have weakened it was vetoed in 2022, but the issue could come back. A good installer will model your savings under conservative assumptions, not just today's rules. Compare the estimated annual production, which in Orlando is often in the range of 1,400 to 1,550 kWh per installed kW per year for a well-oriented, unshaded roof, against your actual usage from the last 12 months of bills. If an installer's production claim is far above that range, ask them to show the modeling tool and inputs.
It can be, but the math is tighter. The federal Section 25D credit ended for expenditures after December 31, 2025, so cash and loan purchases no longer get 30 percent back. Florida's sales tax and property tax exemptions still apply. With Orlando's strong sun and electric rates, payback often runs roughly 9 to 14 years. Homes with high summer cooling bills, unshaded south or west roof planes, and a roof with 15 or more years of life left fare best. Ask a tax professional about third-party-owned options before assuming anything.
Look for a Certified Solar Contractor license (CVC) or a Certified Electrical Contractor license issued by the Florida DBPR. You can verify status, disciplinary history, and the qualifying license holder at MyFloridaLicense.com. A company can operate under a qualifier's license, so confirm the name on your contract matches. Unlicensed work can void permits and leave you without recourse, so check this before any deposit.
Properly engineered systems are designed to meet Florida Building Code wind loads, and many panels and racking systems have been tested for high wind uplift. Failures usually come from poor attachment, weak or aging roof decking, or debris impact. Ask for stamped engineering for your address, the attachment spacing, and the manufacturer wind rating. Also check that your homeowner's policy covers the panels, since coverage differs between carriers.
Possibly, yes. OUC is a municipal utility that sets its own program terms, while Duke Energy Florida is regulated by the Florida Public Service Commission. Both generally credit excess generation against future usage, but terms for annual settlement, fees, and system size limits can differ. Get the current interconnection rules in writing from your actual utility, because your electric provider depends on your address, not your city name.
Largely, yes. Florida Statute 163.04 prevents HOAs and similar associations from prohibiting solar collectors on a home. They can still adopt reasonable rules about placement, as long as those rules do not impair the system's effective operation. If your board resists, ask your installer for a layout that meets their placement preferences, and submit the application in writing so you have a paper trail.
Physical installation often takes one to three days. The whole process usually takes about 6 to 12 weeks, covering design, engineering, permitting, inspection, and utility permission to operate. Timing depends on your building department's queue and the utility's interconnection speed. Be cautious about installers who say you can switch on the system before approval. Running it early can violate interconnection rules.
A battery makes sense if backup power during hurricane outages matters to you, since most grid-tied systems shut off when the grid goes down. A single battery typically costs about $10,000 to $18,000 installed and may power only critical loads like the refrigerator, lights, and some outlets, not a whole-home air conditioner. If net metering credits your excess at a fair rate, a battery rarely pays for itself on bill savings alone. Treat it as resilience insurance and size it to your needs.
For contractors
Hero365 customers get pinned placement on this page, an AI receptionist that answers and books their calls 24/7, and a full AI back office — scheduling, estimates, invoicing — for $19.99/month.